Downloads
Download – Shutdown Scheduler v1.0
Shutdown Scheduler is a small utility to automate shutdown task. This is the program in which we can specify the given task and give the time, at what time that the task will be executed. This is very useful utility by which we can easily automate our computer.

Requirements
Windows Operating Systems
Windows Vista, Windows Server 2008, Windows XP, Windows Server 2003
Prerequisites
Microsoft .Net Framework 2.0 or higher
Features
As above mentioned this program is used to automate shutdown task. This program provides six shutdown tasks to schedule for next 24 Hrs.
Turn Off, Restart, Hibernate, Lock Your Computer, Sleep and Log Off.
This program also provides a Quick Action Section in which we can perform the entire task which are given above instantly.
This utility (Shutdown Scheduler) has been developed by Ganesh (Our respected member of MeraWindows.Com), So all credits goes to him.
Download: Shutdown Scheduler v1.0
The download link is outdated.Plz update it.
Thanks for attention, link updated.